A Change of Scenery.

Starting to cold mould the foredeck, install windlass base and the beginning of the tankage installation.
After the foredeck I will make and install the forward hatch.
The first layer on the foredeck is 9mm meranti ply. Not sure about the next layer. Either 6 or 9mm. Lots of camber. Any comment Gary.






Thursday 6 September 2018

Alaskan Yellow Cedar

Using Alaskan Yellow cedar for all kinds of framing on Spindrift. Cut the end of a dressed bit of 100x50 today and marvelled at the number of grain rings. 92 in 46.7mm. that means (at that rate) for that tree to reach one metre diameter it would be 985 years old. Seems Spindrift was started about the time Maori colonised New Zealand!
The notes on the Rosenfeld Kidson web stated "Sustainably Harvested" Really!