Thursday 27 October 2016

Sawn and glued deck beam added to frame #6

The next move is to stand this frame up. 2 man job. Too heavy for one. The photo showes shows the forward face. The hole will be access to the rear end of the  engine / gearbox. It will be filled in with a lift out door from under the cabin sole. Think I will make the door before I stand the frame up.

Wednesday 12 October 2016

Ring Frame Under the Well Deck

#5. This one was easy.
Tools and plan on the floor ready to loft bulkhead #6. This is the aft end of the well-deck and the beginning of the cabin.