Monday 18 June 2018

A Welcome Change of Scenery

First good looks up the right way. Now the thinking starts.
Engine room and forward accommodation with double bed in front of the bulkhead

Galley, day area, two bunks, dining. Cockpit aft of the bulkhead




Head, Wet locker, ablutions, clothes

Engine room. 2m long


Saturday 16 June 2018

Roll Over

Four chain blocks, A bunch of lifting slings and two good helpers and it was done. All before lunch. Work went as planned except for a snitchy chain block that held the roll over up for a bit. We swapped it out for a more reliable one.
Method - Spindrift was rolled within the slings. When we ran out of chain length we put the boat down in two slings slung from the roof trusses then ran the chains back to start again.
Now all I have to do is level Spindrift up fore and aft with the waterline.