Monday 23 May 2016

Now to start

The shed is complete. The floor will come later.
Today I bought a Ryobi table saw, timber and particle board for the floor and most of the timber for the ladder.
Also found some timber for the bottom and more for fit-out.









Sunday 15 May 2016

Sunday - Day off.

Instead of working I have taken the day off. Just for fun and a bit of practice with the offsets I drew them on the shed wall full size. Rough as but it gives the general idea. I see that station #2 is a bit deep.. Plan is OK.

Friday 13 May 2016

Shed is all covered in

Only have the floor and security to completely finish the shed. I will build the Ladder that Spindrift's hull will be built on prior to building the floor.

Wednesday 4 May 2016

Achieve Great Things

I made a roll up blind for the end wall. Works well. That is it rolled up about half way up the end. Still have a gap to fill above it. Then I filled in the last 2 metres of one of the sides. Rolled down the skin and saw what it said for the first time... ACHIEVE GREAT THINGS. I thought that was appropriate.
One step at a time, little by little the Spindrift Project continues and will achieve great things.