The forward toerail, hatch, grab rail and deck almost complete.
The anchor chain locker has been started and is heavily everdured in this photo. The windlass will be at the aft end of the foredeck to the left of the hatch and controlled from the helm station. It will also be able to be controlled from a switch by the windlass. The chain locker is also well aft just below the windlass.
This blog is about my build of our boat "Spindrift / Rehutai" and its cruises. It is Design # 71 from Gary Underwood - A 10 metre, multi-chine ply passage maker powered by a 35hp Beta (Kubota)