Saturday 16 June 2018

Roll Over

Four chain blocks, A bunch of lifting slings and two good helpers and it was done. All before lunch. Work went as planned except for a snitchy chain block that held the roll over up for a bit. We swapped it out for a more reliable one.
Method - Spindrift was rolled within the slings. When we ran out of chain length we put the boat down in two slings slung from the roof trusses then ran the chains back to start again.
Now all I have to do is level Spindrift up fore and aft with the waterline.












No comments:

Post a Comment

Please leave your name in the comment when commenting or will be deleted.