Cabin sides on, cabin top beams fitted.
Next jobs are glass the cabin hull joint with heavy cloth, cut the windows out, start on the galley then the helm station.....
This blog is about my build of our boat "Spindrift / Rehutai" and its cruises. It is Design # 71 from Gary Underwood - A 10 metre, multi-chine ply passage maker powered by a 35hp Beta (Kubota)
Friday, 6 September 2019
Tuesday, 20 August 2019
Friday, 16 August 2019
Friday, 9 August 2019
Saturday, 27 July 2019
Doors
Saturday, 29 June 2019
Forward Cabin Bulkhead And Door
Dry fit of the Bulkhead and door to the well-deck and forward.
The aft bulkhead is now glued in also.
Need more hardwood for the cabin top beams with four more to make.

Sunday, 16 June 2019
Main Cabin Started
Saturday, 25 May 2019
Cabin Sheer
With the help of a bit of designer input we came up with this. Thanks Gary. I added a straight edge so that I can view the result better.
Thursday, 16 May 2019
Main Cabin
Saturday, 4 May 2019
Back to the beginning.
I have been asked for a basic outline of Spindrift. It is in my very first post on Thursday, January 21st. http://thenewspindrift.blogspot.com/2016/01/the-project-begins.html
Subscribe to:
Posts (Atom)




