Monday, 21 November 2016

Thursday, 10 November 2016

My Yellow Cedar has arrived in Mt Wellington

At last my yellow cedar has arrived in Mt Wellington. 1.5 cubes to be packed and sent to Ngunguru.
Mine is the 100 * 50mm.


Tuesday, 8 November 2016

# 6 Bulkhead





Number 6 bulkhead stood up.
The square in the top centre is for access to the aft end of the engine. 
The beam across the middle is to support the cabin sole.


Thursday, 27 October 2016

Sawn and glued deck beam added to frame #6

The next move is to stand this frame up. 2 man job. Too heavy for one. The photo showes shows the forward face. The hole will be access to the rear end of the  engine / gearbox. It will be filled in with a lift out door from under the cabin sole. Think I will make the door before I stand the frame up.

Wednesday, 12 October 2016

Ring Frame Under the Well Deck

#5. This one was easy.
Tools and plan on the floor ready to loft bulkhead #6. This is the aft end of the well-deck and the beginning of the cabin.










Tuesday, 20 September 2016

#4 Up

#3 frame stood up to get it out of the way while waiting for longer timber. Need 3m+ for laminated deck beams.


Monday, 19 September 2016

A big of glueing going on - Frame three

Frame #3. Forward welldeck bulkhead and deck beam. The smaller ply will be the forward bunk base.