The next move is to stand this frame up. 2 man job. Too heavy for one. The photo showes shows the forward face. The hole will be access to the rear end of the engine / gearbox. It will be filled in with a lift out door from under the cabin sole. Think I will make the door before I stand the frame up.
This blog is about my build of our boat "Spindrift / Rehutai" and its cruises. It is Design # 71 from Gary Underwood - A 10 metre, multi-chine ply passage maker powered by a 35hp Beta (Kubota)
Thursday, 27 October 2016
Monday, 17 October 2016
Wednesday, 12 October 2016
Ring Frame Under the Well Deck
#5. This one was easy.
Tools and plan on the floor ready to loft bulkhead #6. This is the aft end of the well-deck and the beginning of the cabin.
Tools and plan on the floor ready to loft bulkhead #6. This is the aft end of the well-deck and the beginning of the cabin.
Saturday, 8 October 2016
Tuesday, 20 September 2016
#4 Up
#3 frame stood up to get it out of the way while waiting for longer timber. Need 3m+ for laminated deck beams.
Monday, 19 September 2016
Tuesday, 13 September 2016
Wednesday, 7 September 2016
Feather-boad - This works for me
This works well for long planks and also for those small bits to cut that you don't want to hold.. The feather-board keeps the wood tight against the guide.
Tuesday, 6 September 2016
Slowly, slowly
Frame one completed waiting to be stood up. Frame two under construction. Tomorrow I will cut lamination strips for the deck beam and glue it up.
![]() |
| Frame one |
![]() |
| Frame one deck beam |
![]() |
| Frame one waiting to be stood up |
Monday, 29 August 2016