My block and tackle system worked fantastically. Didn't get a drop of resin on my gloves.
This blog is about my build of our boat "Spindrift / Rehutai" and its cruises. It is Design # 71 from Gary Underwood - A 10 metre, multi-chine ply passage maker powered by a 35hp Beta (Kubota)
Tuesday, 30 May 2017
First Sheet Glued
The aft sheet is up and ready to resin the second sheet.
My block and tackle system worked fantastically. Didn't get a drop of resin on my gloves.
My block and tackle system worked fantastically. Didn't get a drop of resin on my gloves.
Saturday, 27 May 2017
Scarfing 18mm ply
That worked out OK. All scarfs completed now for the bottom.
I have also rigged a block and tackle system for lifting the resined sheets into place on the glued bottom planks. Don't have to handle the ply except for screwing it down.
I will now be able to lift the sheets from the floor then lower the ply over locating pegs in the timber bottom to place it in exactly the right place. I can now do this gluing on my own.
I have also rigged a block and tackle system for lifting the resined sheets into place on the glued bottom planks. Don't have to handle the ply except for screwing it down.
I will now be able to lift the sheets from the floor then lower the ply over locating pegs in the timber bottom to place it in exactly the right place. I can now do this gluing on my own.
Tuesday, 23 May 2017
Getting Ready To Scarf The Bottom 18mm Ply
Photos tell the story best. The scarfs are 8:1. The first small one is my first ever practice scarf of three pieces of ply. Fitted together perfectly.
Mmmmm...... So here goes.
Friday, 19 May 2017
Bottom roughed out.
I am thinking that the next task is to mark and scarf the 18mm ply, glue it onto the bottom then fare all.
Learning daily how to carry out the next step. Still have to figure how to scarf 18mm meranti. It will happen.
Learning daily how to carry out the next step. Still have to figure how to scarf 18mm meranti. It will happen.
Thursday, 18 May 2017
Tuesday, 16 May 2017
Almost completed the bottom planks.
Friday, 12 May 2017
A little Further On.
Seven planks glued and nailed (75 Bronze annular ring nails - made in NZ) Two and a very small bit to go then adding 18mm Meranti ply on top. Going well. There is a bit of weight up there. Block and tackle worked well.
Gary - do you have a few long sash clamps that I could borrow for a few days so I can finish the bottom. I need a few longer ones.
Gary - do you have a few long sash clamps that I could borrow for a few days so I can finish the bottom. I need a few longer ones.
Thursday, 4 May 2017
Three Bottom Planks Glued and Nailed
Three Bottom Planks Glued and Nailed.
I found some big butty bronze hold-fast ring nails Stanley Marine. Might help.
I found some big butty bronze hold-fast ring nails Stanley Marine. Might help.
Monday, 1 May 2017
The First Bottom Plank Goes Up
Up she goes. It is a 12 metre plank. 145 x 45mm treated pine. Pretty heavy.
Progressing. Frame and stringer fairing is mostly finished. Working on the knuckle at the base of the stem also. Photos to come.
Progressing. Frame and stringer fairing is mostly finished. Working on the knuckle at the base of the stem also. Photos to come.
Tuesday, 18 April 2017