Seven planks glued and nailed (75 Bronze annular ring nails - made in NZ) Two and a very small bit to go then adding 18mm Meranti ply on top. Going well. There is a bit of weight up there. Block and tackle worked well.
Gary - do you have a few long sash clamps that I could borrow for a few days so I can finish the bottom. I need a few longer ones.
This blog is about my build of our boat "Spindrift / Rehutai" and its cruises. It is Design # 71 from Gary Underwood - A 10 metre, multi-chine ply passage maker powered by a 35hp Beta (Kubota)
Friday, 12 May 2017
Thursday, 4 May 2017
Three Bottom Planks Glued and Nailed
Three Bottom Planks Glued and Nailed.
I found some big butty bronze hold-fast ring nails Stanley Marine. Might help.
I found some big butty bronze hold-fast ring nails Stanley Marine. Might help.
Monday, 1 May 2017
The First Bottom Plank Goes Up
Up she goes. It is a 12 metre plank. 145 x 45mm treated pine. Pretty heavy.
Progressing. Frame and stringer fairing is mostly finished. Working on the knuckle at the base of the stem also. Photos to come.
Progressing. Frame and stringer fairing is mostly finished. Working on the knuckle at the base of the stem also. Photos to come.
Tuesday, 18 April 2017
Wednesday, 29 March 2017
Sunday, 26 March 2017
Friday, 17 March 2017
Wooden Boats and Nature
Daniel Feinstein stated that wooden boats are the only thing that man can make that is almost as beautiful as nature.. Where else can one find curves as beautiful as this. They are from nature like a seed head bending in a breeze or the curve of a breaking wave.
Saturday, 11 March 2017
Wednesday, 8 March 2017
Lower Chine Stringer
Unable to bend the lower chine 100 x 20 plank as shown on plan. Too much curve to bend the plank edgeways. Looks like it will have to be as on the photo. That works well.
Thursday, 2 March 2017
installing a shelf to support the welldeck.
The pencil line on the stringer is the change of angle fairing line.
Subscribe to:
Posts (Atom)


















