Tuesday, 20 September 2016

#4 Up

#3 frame stood up to get it out of the way while waiting for longer timber. Need 3m+ for laminated deck beams.


Monday, 19 September 2016

A big of glueing going on - Frame three

Frame #3. Forward welldeck bulkhead and deck beam. The smaller ply will be the forward bunk base.

Tuesday, 13 September 2016

Wednesday, 7 September 2016

Feather-boad - This works for me

This works well for long planks and also for those small bits to cut that you don't want to hold.. The feather-board keeps the wood tight against the guide.

Tuesday, 6 September 2016

Slowly, slowly

Frame one completed waiting to be stood up. Frame two under construction. Tomorrow I will cut lamination strips for the deck beam and glue it up.
Frame one

Frame one deck beam

Frame one waiting to be stood up

Frame two. Quite a bit to do yet. This has a ply bulkhead that will be fitted pre glue-up and another deck beam to be laminated. Currently planning to glue all in one shot. I will finish the beam first.

Monday, 29 August 2016

Thursday, 21 July 2016

Time on my hands

I have redrawn the cabin line. Added a bit of colour.
That blobby looking thing on the well deck is me. Life size.

Wednesday, 20 July 2016

Waiting

I wait for timber so all a bit quiet at the moment.
I laminated the hatch top for the forward cabin and a turtle for it to slide into. Cant do more to that until I fit the foredeck.
Have lofted all I can on the floor. Visited Seamac for doors and windows. Always something productive to do.
Also bought a new Goiot 6230mm Hatch  for the well-deck and a deck prism from Stanley Marine. Only $250 for the hatch. The same hatch for our old Spindrift in 1992 cost us over $600.



Tuesday, 5 July 2016

Bottom Planks Scarfed.

Bottom Planks Scarfed. Now about 11 ~ 12m long

Had a bit of a practice on some kahikatea doing lap joints for frames.

 Now drawing the full size frames on the floor with some head scratching.