Little by little things move along. Window installation has started and the windscreen wiper set up and going.
This blog is about my build of our boat "Spindrift / Rehutai" and its cruises. It is Design # 71 from Gary Underwood - A 10 metre, multi-chine ply passage maker powered by a 35hp Beta (Kubota)
Friday, 23 July 2021
Thursday, 8 July 2021
Electrics
Almost everything electrical is up and running.
Still awaiting an anchor light, switch for the light under the sink and need to install the fridge.
Oh yes. Have to fill and test the hydraulic steering before trying the Autopilot. GPS & Radar seem to work well. Very pleased with Furuno.
Subscribe to:
Posts (Atom)