All four purple heart rails are bedded. Now hust have to glue 148 wooden caps cavering the screws.
This blog is about my build of our boat "Spindrift / Rehutai" and its cruises. It is Design # 71 from Gary Underwood - A 10 metre, multi-chine ply passage maker powered by a 35hp Beta (Kubota)
Friday, 25 December 2020
Saturday, 12 December 2020
Rub Rail
Well, the first 60 x 40mm purple heart rub-rail is on. Needed three strong bods, more hands and jacks but managed to bend them it into place and screw with Sika 291 behind on my own.
I did dry fit it first. Three more to go.
Tuesday, 1 December 2020
Spindrift is Progressing
Launch date is still the 28th but here are a few progress photos on the outside.
| Cleat and Dinghy tow guideAdd caption |
| Hydraulic steering ram cover |
| Foredeck |
| Bow fitting & vent |
| Bow fitting & vent Add caption |
| Installing vent, deck prism & mast step |
| Welldeck |
| Rain catching roof |
| Helm hatch |
| Radar pedestal |
| Hatches |
| Dinghy transom chocks |
| Gas bottle locker, engine room vent |
Subscribe to:
Comments (Atom)