The helm station is a bit of a head scratcher. Lots happening there. Plotter / Sounder / Radar, Auto Pilot control, Engine instrumentation and controls, VHF, Battery switches and circuit breakers, Wheel and helm pump, double helm seat with a tray under and two draws (Cutlery), fridge below....
Started yesterday. Nothing glued in yet.
This blog is about my build of our boat "Spindrift / Rehutai" and its cruises. It is Design # 71 from Gary Underwood - A 10 metre, multi-chine ply passage maker powered by a 35hp Beta (Kubota)
Friday, 22 November 2019
Tuesday, 12 November 2019
Welldeck Bulwark
The laminated bulwarks at the welldeck are all glued up. There's a bit of tidying up to do then classing.
Also all the window frames are glued in. The next job there will be to rout the 30mm rabbets in the cabin sides and front. The helm station will be behind the near window.
Also all the window frames are glued in. The next job there will be to rout the 30mm rabbets in the cabin sides and front. The helm station will be behind the near window.
Subscribe to:
Posts (Atom)