This blog is about my build of our boat "Spindrift / Rehutai" and its cruises. It is Design # 71 from Gary Underwood - A 10 metre, multi-chine ply passage maker powered by a 35hp Beta (Kubota)
Friday, 13 December 2019
Thursday, 12 December 2019
Cabin Top
Preparing the aft two 9mm sheets for gluing. From there it will be lowered onto locating pins. The two sheets are already glued together with a fillet.
More photos tomorrow as today I glued it down. Next job... a little faring then glue down the next layer which is 6mm ply.
More photos tomorrow as today I glued it down. Next job... a little faring then glue down the next layer which is 6mm ply.
Tuesday, 10 December 2019
Cabin Top
Not so easy to edge join the ply with a fillet. Managing though once I got the hang of it.
There will be a layer of 6mm added to this 9mm.
Not sure yet what to do with the eyebrow. Certainly will maintain full depth at the centre and perhaps curve back some to the edge of the cabin.
There will be a layer of 6mm added to this 9mm.
Not sure yet what to do with the eyebrow. Certainly will maintain full depth at the centre and perhaps curve back some to the edge of the cabin.
Friday, 22 November 2019
Helm Station
The helm station is a bit of a head scratcher. Lots happening there. Plotter / Sounder / Radar, Auto Pilot control, Engine instrumentation and controls, VHF, Battery switches and circuit breakers, Wheel and helm pump, double helm seat with a tray under and two draws (Cutlery), fridge below....
Started yesterday. Nothing glued in yet.
Started yesterday. Nothing glued in yet.
Tuesday, 12 November 2019
Welldeck Bulwark
The laminated bulwarks at the welldeck are all glued up. There's a bit of tidying up to do then classing.
Also all the window frames are glued in. The next job there will be to rout the 30mm rabbets in the cabin sides and front. The helm station will be behind the near window.
Also all the window frames are glued in. The next job there will be to rout the 30mm rabbets in the cabin sides and front. The helm station will be behind the near window.
Tuesday, 29 October 2019
Friday, 6 September 2019
Main Cabin Progress
Cabin sides on, cabin top beams fitted.
Next jobs are glass the cabin hull joint with heavy cloth, cut the windows out, start on the galley then the helm station.....
Next jobs are glass the cabin hull joint with heavy cloth, cut the windows out, start on the galley then the helm station.....
Tuesday, 20 August 2019
Friday, 16 August 2019
Friday, 9 August 2019
Saturday, 27 July 2019
Doors
Saturday, 29 June 2019
Forward Cabin Bulkhead And Door
Dry fit of the Bulkhead and door to the well-deck and forward.
The aft bulkhead is now glued in also.
Need more hardwood for the cabin top beams with four more to make.
Sunday, 16 June 2019
Main Cabin Started
Saturday, 25 May 2019
Cabin Sheer
With the help of a bit of designer input we came up with this. Thanks Gary. I added a straight edge so that I can view the result better.
Thursday, 16 May 2019
Main Cabin
Saturday, 4 May 2019
Back to the beginning.
I have been asked for a basic outline of Spindrift. It is in my very first post on Thursday, January 21st. http://thenewspindrift.blogspot.com/2016/01/the-project-begins.html
Friday, 3 May 2019
Main Cabin Sole Progress
I started laying the cabin sole ply on Thursday. Quite happy with the progress.
I need lift rings for the centre three panels (From the stern) and to lift all and Everdure the framing and ply.
After that start on the Cabin sides and top.
Galley to port. Helm on the Starboard side.
I need lift rings for the centre three panels (From the stern) and to lift all and Everdure the framing and ply.
After that start on the Cabin sides and top.
Galley to port. Helm on the Starboard side.