Monday 26 June 2017

Diagonal Bow Laminations


That looks OK......I think. 150mm strips of 9 mm ply. Just long enough. No need to scarf :)



Monday 19 June 2017

Tuesday 6 June 2017

More Frames and a Practice Scarf

All the intermediate frames glued in place awaiting scary fairing along with the bottom.


Having a practice scarf with Gary's Gougeon Scarfer. Still have to perfect this before I start the topsides ply. Two skins of 9mm Meranti.


Saturday 3 June 2017

Bottom ply is on.

Next step - adding intermediary frames and fairing then bottom chine. I will pat my own back about the perfect scarfs. Even a prof would be proud.