Sunday 22 January 2017

One and a Half Stringers

One and a Half Stringers on. Another half on the floor awaiting glue and clamps. Certainly could do with some more "F" type clamps. Lots of stringers to go yet.


The stem is starting to look like one.
Plumb bob works well from overhead. It matches the string line at the base.


Thursday 5 January 2017

Stringers

Mmmm. We will see how this goes. 100mm wide cedar does not bend on edge easily. Hydraulic jack dealt with it.
The plan is to fit the scarfed planks, join them then glue in place full length. Have to cut these notches another 20mm deeper yet. The three main stringers are 2 x  95 x 20mm planks.